SERVICE CONTRACTS
Belnor Engineering's technicians will perform verification on equipment listed to ensure systems are operating within manufacturers' specifications.
Scheduled service contracts include, (but are not limited to):
-
Operational checks for, and adjustments to:
-
Fume hood monitor alarm functions
-
Fume hood exhaust valve pressure switches
-
Fume hood sash sensors
-
Make-up air controllers for command vs. feedback signals
-
Supply airflow control valves
-
-
Verification of, and adjustments to:
-
Exhaust air valve movement and speed
-
Room pressurization performance to ensure secondary containment
-
-
Complete fume hood testing and performance audit, as per:
-
ANSI/ASHRAE 110-1995 fume hood test procedures
-
As-built drawings by Belnor Engineering
-
DOCUMENTATION:
Belnor will provide a complete report detailing the procedures used for testing, condition of each fume hood, recommendations, as well as results of the local flow visualization and face velocity measurements.